Project Summary:

Project Type:
Urban Reconstruction

Owner:
City of Minot

Overview:

31st Avenue SE was a two-lane rural roadway with a shared-use path on the south side. The intent of this project was to construct a three-lane urban concrete arterial and reconstruct the shared-use path. This is a vital corridor that connects residential areas to US 83. The drainage facilities were a major component of the project. Construction began April 2020 and was completed spring 2021. The project included the first roundabout in the City of Minot.

Project Details:

The preliminary phase included a detailed drainage analysis. Apex’s water resources group studied the existing hydrology and developed alternatives to combine multiple existing outfalls into one outlet directly into Puppy Dog Coulee. The purpose of this project was to improve the 31st Avenue SE corridor, from Broadway (US 83) to 13th Street SE, which serves as an arterial roadway for the southeast part of Minot. The project addressed several issues including increasing roadway capacity, improving safety for the traveling public, enhancing access for non-motorized users, and correcting isolated drainage issues along the corridor.

Back to Projects